¶1Opinion by
¶2On October 18, 1976, the Department of Environmental Resources (DER) issued to Mignatti Construction Company, Inc. (Mignatti) a surface-mining permit to operate a stone quarry on a 79.4-acre site in West Rockhill Township, Bucks County. Salford and West Rockhill Townships (Townships) appealed the issuance of the permit to the Pennsylvania Environmental Hearing Board (Board). The Board set aside the permit and required Mignatti to submit a “soil and erosion plan” (sic)
¶3Mignatti’s Appeal
¶4Mignatti first argues that the Board erred when it concluded that Section 6.1 of APCA requires the issuance of an air quality permit prior to the operation of a quarry. We disagree. Section 6.1 provides, in pertinent part, as follows:
(a) On or after July 1, 1972, no person shall construct, assemble, install or modify any stationary air contamination source, or install *500thereon any air pollution control equipment or device ... unless such person has applied to and received from the department written approval so to do----
(b) No person shall operate any stationary air contamination source which is subject to the provisions of subsection (a) of this section unless the department shall have issued to such person a permit to operate such source in response to a written application----
¶5The Board found, on substantial evidence, and Mignatti does not here dispute, that its proposed quarry is a stationary air contamination source as defined by Section 3(4), (7), and (8) of APCA, 35 P.S. §4003(4), (7), (8).
¶6Finally, Mignatti argues that the Board erred when it concluded that Mignatti had not submitted an adequate erosion and sedimentation control plan.
¶725 Pa. Code §102.5 (b) provides that an erosion and sedimentation control plan must consider, inter alia, the following factors: (1) the topographic feature of the project area, (2) the types, depth, slope, and areal extent of the soils, (3) the proposed alteration to the area, and (4) the amount of runoff from the project area and the upstream watershed area. The Board concluded that “the plan is silent or contains insufficient information on such considerations as topographic features, soil characteristics and the amount of runoff from the project and the upstream watershed.” Our review of the record indicates that the plan, taken in conjunction with the supplementary material supplied by Mignatti, contains sufficient information as to topographic features and soil characteristics. Mignatti submitted numerous drawings detailing the topography of the area. Mignatti also submitted results of test borings, along with a soil description. We must conclude, therefore, that the Board erred in its conclusion that this information was insufficient. We cannot conclude on this record, however, that the Board erred in its conclusion that the runoff and upstream watershed information was insufficient, and we will affirm the Board on that aspect.
¶8*502The Board also concluded that the proposed sedimentation basin capacity is insufficient to control the surface water runoff. We agree. 25 Pa. Code §102.13 (d)(1) provides that a sedimentation basin “shall have a capacity of 7,000 cubic feet for each acre of project area tributary to it.” The erosion and sedimentation control plan provides for a 16-acre work area and a 5.5-acre quarry area. The Board concluded that the 21.5 acres would thus require a basin capacity of 150,500 cubic feet and noted that the proposed basin capacity is only 75,829 cubic feet.
¶9Mignatti argues that this analysis is faulty because of 25 Pa. Code §102.11, which provides that the 7,000-cubic-feet requirement is mandated “unless the designer of the erosion and sedimentation control plan shows that alteration of these . . . facilities . . . shall prevent accelerated erosion and sedimentation.” (Emphasis added.) We find no evidence on the record, however, that the designer of the plan has met this burden and wilLaffirm the Board’s conclusion.
¶10Townships’ Appeal
¶11The Townships first argue that DEB failed to fulfill its obligations under Article 1, Section 27 of the Pennsylvania Constitution, which states:
The people have a right to clean air, pure water, and to the preservation of the natural, scenic, historic and esthetic values of the en*503vironment. Pennsylvania’s public natural resources are the common property of all the people, including generations yet to come. As trustee of these resources, the Commonwealth shall conserve and maintain them for the benefit of all the people.
¶12In Payne v. Kassab, 11 Pa. Commonwealth Ct. 14, 312 A.2d 86 (1973), aff’d, 468 Pa. 226, 361 A.2d 263 (1976), we enunciated a threefold standard for testing compliance with Section 27:
(1) Was there compliance with all applicable statutes and regulations relevant to the protection of the Commonwealth’s public natural resources? (2) Does the record demonstrate a reasonable effort to reduce the environmental incursion to a minimum? (3) Does the environmental harm which will result from the challenged decision or action so clearly outweigh the benefits to be derived therefrom that to proceed further would be an abuse of discretion?
¶1311 Pa. Commonwealth Ct. at 29-30, 312 A.2d at 94.
¶14Our review of the record indicates that, apart from the deficiencies in the erosion and sedimentation control plan, DER has fulfilled the Payne requirements and thereby complied with the constitutional requirements. First, DER has complied with the applicable statutes.
¶15Second, the record demonstrates a reasonable effort to reduce the immediate environmental incursion from the quarry to a minimum. In addition to the previously discussed safeguards, there are stringent controls on blasting and noise levels. We are persuaded that these conditions will keep the immediate environmental incursion to a reasonable minimum. See Delaware County Community College v. Fox, supra, 20 Pa. Commonwealth Ct. at 357, 342 A.2d at 481.
¶16Finally, we believe that the record demonstrates that benefits of the quarry are substantial and outweigh the environmental harm which will result from the quarry construction.
¶17*505The Townships next argue that the adjudication by the Board is invalid since the Board, in issuing its decision, violated its own regulation, 25 Pa. Code §21.86(a), which reads in pertinent part as follows:
(a) Hearings may be held, at the discretion of the Board, before the Board as a whole, by individual Board members sitting as hearing examiners, or by hearing examiners who are not members of the Board. Hearings held by hearing examiners not members of the Board will be decided by the Board based upon its review of the record and the examiner’s proposed adjudication.
¶18The decision was written by someone other- than the hearing examiner and the Townships contend that there is “nothing in the record which indicates that the hearing examiner prepared or submitted a proposed adjudication.” This allegation, however, is insufficient to overcome the prima facie presumption of the regularity of the acts of public administration officials. Unemployment Compensation Board of Review v. Hart, 22 Pa. Commonwealth Ct. 225, 348 A.2d 497 (1975); Fox v. Pennsylvania Securities Commission, 17 Pa. Commonwealth Ct. 72, 328 A.2d 573 (1974). This presumption “exists until the contrary appears. ’ ’ Beacom v. Robison, 157 Pa. Superior Ct. 515, 521, 43 A.2d 640, 643 (1945). Since the Townships have not sustained their burden of showing an irregularity, we must reject their argument.
¶19We have considered the Townships’ other arguments and find them to be meritless. Accordingly, we enter the following
¶21And Now, this 28th day of February, 1980, the order of the Pennsylvania Environmental Hearing Board, dated May 3, 1978, except that portion requiring Mignatti Construction Co., Inc., to submit an erosion and sedimentation control plan in accordance with the provisions contained in 25 Pa. Code §102.5 (b)(1) and (2) (topographic features and soil characteristics of the project area), is hereby affirmed.
¶22 Apparently the Board had in mind an erosion and sedimentation control plan.
¶2325 Pa. Code §127.14 provides that an air quality permit is not required, despite Section 6.1, if it is a source “determined to be of minor significance by the Department.” Nothing in the record, however, supports a determination that a rock quarry is a source of minor significance, nor has Mignatti received a determination by DER that the source is of minor significance. See 25 Pa. Code §123.1.
¶24Mignatti further argues that the capacity of the basins was not put in issue before the Board and that no testimony was presented that they were of inadequate capacity. The regulations, however, clearly place the burden on Mignatti to demonstrate the effectiveness of the lesser-capacity basin.
¶25Mignatti suggests that 16 acres, or the work area, is the only acreage for which basins are required. Even accepting this figure, however, the capacity of the basins is inadequate, as a 16-acre area would require 112,000 cubic feet of basin area.
¶26The applicable statutes are The Clean Streams Law, Act of June 22, 1937, P.L. 1987, as amended, 35 P.S. §691.1 et seq., and the Surface Mining Conservation and Reclamation Act, Act of May 31, 1945, P.L. 1198, as amended, 52 P.S. §1396.1 et seq., and the regulations adopted pursuant thereto.
¶27 35 P.S. §691.5(a). Section 5(a) reads, in pertinent part:
(a) The board and the department . . . shall . . . consider, where applicable, the following:
(1) Water quality management and pollution control in the watershed as a whole;
*505(2) The present and possible future uses of particular waters;
(5) The immediate and long-range economic impact upon the Commonwealth and its citizens.