65 Ill. App. 70

Cohen v. Van Sickle

Appellate Court of Illinois

Decided May 16, 1896

Appellate Court of Illinois · decided 1896-05-16

Assumpsit, for labor and materials furnished. Appeal from the Circuit Court of Yermilion County; the Hon. Ferdinand Bookwalter, Judge, presiding. Heard, in this court at the November term, 1895.

Affirmed · Decided 1896-05-16

Mr. Justice Wall

¶1delivered the opinion oe the Court.

¶2This is an appeal from, a judgment for six hundred dollars for a hot water heating apparatus with boiler and attachments, radiators, pipes, fittings, etc., furnished by appellee to appellant for use in his dwelling house.

¶3The contract price was six hundred and seventy-five dollars. It was found that the heater first put in had not sufficient capacity and it was replaced by another of the same kind two sizes larger.

¶4According to the testimony of the appellee, with this change everything was done according to the contract except'the painting and bronzing. This he was willing to do, and sent a painter to the house for that purjiose, but as the evidence tends to show, the wife of the appellant objected to having the work done and the painter went away.

¶5The evidence shows that for what was furnished the sum of six hundred dollars would be a fair price.

¶6The contention of appellant was that the apparatus would not heat the house according to contract, and on this point the evidence was conflicting.

¶7That offered by appellee was to the effect that the apparatus was properly constructed and that when fires were maintained according to the printed directions referred to in the contract the specified heat was produced. That offered by appellant was to the contrary.

¶8The jury might have found either way perhaps, but it is quite clear that according to well settled rules we ought not to disturb the verdict. We are inclined to the opinion the contract was substantially complied with, and that with proper firing the apparatus was sufficient.

¶9The difficulty, perhaps, was that more attention to the fire and the use of more coal were required than appellant expected, especially in severe weather.

¶10This disposed of the main question in the case..

¶11Appellant complains that the second and third instructions for appellee are faulty, but no special objections are pointed out and upon .reading them in the light of the testimony we find nothing objectionable.

¶12Appellant also complains of' the refusal to give' an instruction referred to but not set out in the brief. Turning to the abstract we find that the substance of the refused instruction is plainly contained in others that were given.

¶13It is not necessary to repeat a proposition—indeed it is bad practice to do .so. No other errors are urged in the brief. The judgment is affirmed.