← 65 SO3D 1279 - Ebinger v. Venus Construction Corp.

Ebinger v. Venus Construction Corp.’s Empirical Analysis

2011

Citation profile

9
cited by 9 later decisions
1
states following
April 2018
most recently cited

9 state decisions

Relationships

Relies on 599 So. 2d 1058 - Cole v. Celotex Corp. · 370 So. 2d 521 - Lott v. Haley · 998 So. 2d 16 - MJ Farms, Ltd. v. Exxon Mobil Corp. · 449 So. 2d 448 - Owens v. Martin · 891 So. 2d 1268 - Bailey v. Khoury

Most-quoted passages

The sentences later courts lift from this opinion, ranked by how many decisions quote each — the parts of the opinion doing the work. These counts are smaller than the citation total above because most of the 9 citing decisions cite the case generally; a passage count includes only decisions quoting that exact language verbatim.

  1. “(a) For any deficiency in the performing or furnishing of land surveying services, as such term is defined in R.S. 37:682, including but not limited to those preparatory to construction or in the design, planning, inspection, or observation of construction, or in the construction of any improvement to immovable property, including but not limited to any services provided by a residential building contractor as defined in R.S. 37:2150.1(9). (b) For damage to property, movable or immovable, arising out of any such deficiency. (c) For injury to the person or for wrongful death arising out of any such deficiency. (d) Brought against a person for the action or failure to act of his employees. 110(2)Deficiency, as used in this Section, includes failure to warn the owner of any dangerous or hazardous condition, regardless of when knowledge of the danger or hazard is obtained or should have been obtained. (3) Except as otherwise provided in Subsection A of this Section, this per-emptive period shall extend to every demand, whether brought by direct action or for contribution or indemnity or by third-party practice, and whether brought by the owner or by any other person. C. If such an injury to the property or to the person or if such a wrongful death occurs during the fifth year after the date set forth in Subsection A, an action to recover the damages thereby suffered may be brought within one year after the date of the injury, but in no event more than six years after the date set”
    2 later decisions quote this exact passage
  2. “The Louisiana Revised Statutes are not applied retroactively “unless it is expressly so stated.” La. R.S. 1:2. However, the Louisiana Civil Code makes clear that this rule of statutory construction applies to substantive laws only. In the absence of contrary legislative expression, procedural and interpretive laws apply both prospectively and retroactively. La. C.C. art. 6. “[Statutes of limitation [the common-law analog to statutes of peremption or prescription] are remedial in nature and as such are generally accorded retroactive application.” Lott v. Haley, 370 So.2d 521, 523 (La.1979). La. R.S. 9:2772 [as amended in 2003] does not expressly state that it may be applied retroactively. However, it is a procedural law, establishing a period after which a plaintiff may no longer assert a claim. Subject to the caveat that it may not operate to disturb a vested right, § 2772 may be applied retroactively. Despite the trial court and court of appeal’s rulings in this case, we do not find it necessary to accord the statute retroactive application. The 2003 amendment became effective August 15, 2003, approximately two months before the Ebingers filed suit against Venus. Therefore, its application in this matter is not necessarily retroactive. Although the applicable peremptive period commenced in 1997, before the amendment took effect and before the suit was filed, this antecedent |fldoes not in itself require retroactivity. “[A]pplying a legislative act to conduct antedating the s”
    1 later decision quote this exact passage
  3. “A. Except as otherwise provided in this Subsection, no action, whether ex contractu, ex delicto, or otherwise, including but not limited to an action for failure to warn, to recover on a contract, or to recover damages, or otherwise arising out of an engagement of planning, construction, design, or building immovable or movable property which may include, without limitation, consultation, planning, designs, drawings, specification, investigation, evaluation, measuring, or administration related to any building, construction, demolition, or work, shall be brought against any person performing or furnishing land surveying services, as such term is defined in R.S. 37:682, including but not limited to those services preparatory to construction, or against any person performing or furnishing the design, planning, supervision, inspection, or observation of construction or the construction of immovables, or improvement to immovable property, including but not limited to a residential building contractor as defined in R.S. 37:2150.1 : (1)(a) More than five years after the date of registry in the mortgage office of acceptance of the work by owner. (b) If no such acceptance is recorded within six months from the date the owner has occupied or taken possession of the improvement, in whole or in part, more than five years after the improvement has been thus occupied by the owner. (c) If, within ninety days of the expiration of the five-year peremptive period described in Subparagraph (a)”
    1 later decision quote this exact passage

How this case has been treated — in progress

Whether each later court followed, distinguished, criticized, or overruled this decision. The treatment classification (task #35) runs highest-cited cases first and lights up here as it reaches this one.