| NNL08AD22D | | | | AJ44: Engineering (Engineering) | $31,695.34 | 2008 | 16314956 |
| NNL08AC46D | | | | AJ44: Engineering (Engineering) | $147,706.01 | 2008 | 16565824 |
| NNL08AC46D | 1 | | | AJ44: Engineering (Engineering) | $0.00 | 2008 | 17246976 |
| NNL08AQ02D | | | | AJ44: Engineering (Engineering) | $125,432.74 | 2008 | 17420226 |
| NNL08AQ03D | | | | AJ44: Engineering (Engineering) | $62,163.24 | 2008 | 17625909 |
| NNL08AC92D | | | | AJ44: Engineering (Engineering) | $222,468.56 | 2008 | 17878408 |
| NNM08AB47T | | | | AA34: R&D-Agri Production-Eng Dev | $88,664.00 | 2008 | 18156641 |
| NNL08AQ02D | 1 | | | AJ44: Engineering (Engineering) | $0.00 | 2008 | 18289557 |
| NNL08AA97D | | | | AJ44: Engineering (Engineering) | $200,000.00 | 2008 | 19096416 |
| NNM08AB47T | 1 | | | AA34: R&D-Agri Production-Eng Dev | $0.00 | 2008 | 19162255 |
| NNL08AC46D | 3 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 20639037 |
| NNL08AD22D | 2 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 20748332 |
| NNL08AC92D | 2 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 20805422 |
| NNL09AA68D | 1 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 20887622 |
| NNL09AA64D | 2 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 20977026 |
| NNL08AC92D | 6 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 21321806 |
| NNL09AA68D | | | | AJ44: Engineering (Engineering) | $275,275.47 | 2009 | 21409623 |
| NNL09AA68D | 4 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 21483692 |
| NNL08AD22D | 1 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 21575983 |
| NNL09AA64D | 1 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 21696297 |
| NNL08AC92D | 3 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 21761002 |
| NNL08AC92D | 5 | | | AJ44: Engineering (Engineering) | $0.00 | 2009 | 21822930 |