| HSCG5007C6... | P00003 | | AD63: Construction (Advanced) | $112,397.10 | 2007 | 12270405 |
| HSCG5007C6... | P00001 | | AD63: Construction (Advanced) | ($29,556.65) | 2007 | 12570509 |
| HSCG5007C6... | 0 | | AD63: Construction (Advanced) | $6,848,100.00 | 2007 | 15606803 |
| HSCG5007C6... | P00009 | | AD63: Construction (Advanced) | $10,066.39 | 2008 | 17227582 |
| HSCG5007C6... | P00012 | | AD63: Construction (Advanced) | $2,287.10 | 2008 | 17394584 |
| HSCG5007C6... | P00007 | | AD63: Construction (Advanced) | $6,712.05 | 2008 | 17467669 |
| HSCG5007C6... | P00017 | | AD63: Construction (Advanced) | $13,693.26 | 2008 | 17467670 |
| HSCG5007C6... | P00018 | | AD63: Construction (Advanced) | $38,639.77 | 2008 | 17467671 |
| HSCG5007C6... | P00006 | | AD63: Construction (Advanced) | $4,811.95 | 2008 | 17611721 |
| HSCG5007C6... | P00013 | | AD63: Construction (Advanced) | ($10,000.00) | 2008 | 18159317 |
| HSCG5007C6... | P00014 | | AD63: Construction (Advanced) | $11,549.89 | 2008 | 18159318 |
| HSCG5007C6... | P00005 | | AD63: Construction (Advanced) | $13,430.94 | 2008 | 18378597 |
| HSCG5007C6... | P00004 | | AD63: Construction (Advanced) | $18,300.92 | 2008 | 18596860 |
| HSCG5007C6... | P00011 | | AD63: Construction (Advanced) | $33,161.71 | 2008 | 18924862 |
| HSCG5007C6... | P00016 | | AD63: Construction (Advanced) | ($124,839.54) | 2008 | 19690583 |
| HSCG5007C6... | P00008 | | AD63: Construction (Advanced) | $1,930.42 | 2008 | 19799525 |
| HSCG5007C6... | P00021 | | AD63: Construction (Advanced) | $753.44 | 2008 | 19910240 |
| HSCG5007C6... | P00010 | | AD63: Construction (Advanced) | $8,545.09 | 2008 | 20018757 |
| HSCG5007C6... | P00020 | | AD63: Construction (Advanced) | $40,442.07 | 2008 | 20071241 |
| HSCG5007C6... | P00019 | | AD63: Construction (Advanced) | $771.32 | 2008 | 20237844 |
| HSCG5007C6... | P00015 | | AD63: Construction (Advanced) | $43,470.02 | 2008 | 20347120 |