26 U.S.C. § 45 — for purposes of this section (13 versions over time)

In the case of a facility using wind to produce electricity, the term “qualified facility” means any facility owned by the taxpayer which is originally placed in service after December 31, 1993, and the construction of which begins before January 1, 2025. Such term shall not include any facility with respect to which any qualified small wind energy property expenditure (as defined in subsection (d)(4) of section 25D) is taken into account in determining the credit under such section.

26 U.S.C. § 45 — for purposes of this section (24 versions over time)

In the case of a facility using closed-loop biomass to produce electricity, the term “qualified facility” means any facility—

(i) owned by the taxpayer which is originally placed in service after December 31, 1992, and the construction of which begins before January 1, 2025, or

(ii) owned by the taxpayer which before January 1, 2025, is originally placed in service and modified to use closed-loop biomass to co-fire with coal, with other biomass, or with both, but only if the modification is approved under the Biomass Power for Rural Development Programs or is part of a pilot project of the Commodity Credit Corporation as described in 65 Fed. Reg. 63052.

26 U.S.C. § 45 — for purposes of this section (13 versions over time)

In the case of a facility using open-loop biomass to produce electricity, the term “qualified facility” means any facility owned by the taxpayer which—

(i) in the case of a facility using agricultural livestock waste nutrients—

(I) is originally placed in service after the date of the enactment of this subclause and the construction of which begins before January 1, 2025, and

(II) the nameplate capacity rating of which is not less than 150 kilowatts, and

(ii) in the case of any other facility, the construction of which begins before January 1, 2025.

26 U.S.C. § 45 — for purposes of this section (20 versions over time)

In the case of a facility using geothermal or solar energy to produce electricity, the term “qualified facility” means any facility owned by the taxpayer which is originally placed in service after the date of the enactment of this paragraph and the construction of which begins before January 1, 2025. Such term shall not include any property described in section 48(a)(3) the basis of which is taken into account by the taxpayer for purposes of determining the energy credit under section 48.

26 U.S.C. § 45 — for purposes of this section (4 versions over time)

In the case of a facility using small irrigation power to produce electricity, the term “qualified facility” means any facility owned by the taxpayer which is originally placed in service after the date of the enactment of this paragraph and before October 3, 2008.

26 U.S.C. § 45 — for purposes of this section (11 versions over time)

In the case of a facility producing electricity from gas derived from the biodegradation of municipal solid waste, the term “qualified facility” means any facility owned by the taxpayer which is originally placed in service after the date of the enactment of this paragraph and the construction of which begins before January 1, 2025.

26 U.S.C. § 45 — for purposes of this section (11 versions over time)

In the case of a facility (other than a facility described in paragraph (6)) which uses municipal solid waste to produce electricity, the term “qualified facility” means any facility owned by the taxpayer which is originally placed in service after the date of the enactment of this paragraph and the construction of which begins before January 1, 2025. Such term shall include a new unit placed in service in connection with a facility placed in service on or before the date of the enactment of this paragraph, but only to the extent of the increased amount of electricity produced at the facility by reason of such new unit.

26 U.S.C. § 45 — for purposes of this section (11 versions over time)

In the case of a facility producing qualified hydroelectric production described in subsection (c)(8), the term “qualified facility” means—

(i) in the case of any facility producing incremental hydropower production, such facility but only to the extent of its incremental hydropower production attributable to efficiency improvements or additions to capacity described in subsection (c)(8)(B) placed in service after the date of the enactment of this paragraph and before January 1, 2025, and

(ii) any other facility placed in service after the date of the enactment of this paragraph and the construction of which begins before January 1, 2025.

+ 3 more definitions — see all 11 over time