total acquisition cost
Defined in 1 dictionary — U.S. Code
United States Code
50 U.S.C. § 415a-7 — in this section
The term “total acquisition cost” means the amount equal to the total cost for development and procurement of, and system-specific construction for, a major system.
50 U.S.C. § 415a-8 — in this section
In this section, the terms “cost estimate”, “critical cost growth threshold”, “current Baseline Estimate”, “major system”, and “total acquisition cost” have the meaning given those terms in section 415a–7(a) of this title.
50 U.S.C. § 3101 — in this section
The term "total acquisition cost" means the amount equal to the total cost for development and procurement of, and system-specific construction for, a major system.
50 U.S.C. § 3102 — in this section (2 versions over time)
In this section, the terms “cost estimate”, “critical cost growth threshold”, “current Baseline Estimate”, “major system”, and “total acquisition cost” have the meaning given those terms in section 3101(a) of this title.