Public-domain · open source
OpenJurist

AS 42.30.420

Responsibility of construction project owners

The owner of a construction project that will require excavation shall indicate in bid documents or contracts for construction the existence of underground facilities that the project owner knows are located inside of the proposed area of excavation. This requirement does not release the excavator from the excavator's responsibility under AS 42.30.400 — 42.30.490.

Official source: Alaska State Legislature. Reproduced from public-domain Alaska statutes; confirm against the official source for the current text. Not legal advice.