Ark. Code Ann. § 8-10-404

Cut-off valve and training

Acts 2013, No. 1484, § 1.

For each petroleum pipeline that crosses a watercourse that empties into a public surface water supply above ground or below ground, the owner or operator of the petroleum pipeline is encouraged to:

(1) Install a cut-off valve capable of: Automatically sensing a loss of petroleum flowing in the petroleum pipeline; and

(2) Automatically and manually cutting off the flow of petroleum on each side of each watercourse that discharges into a public surface water supply; and

(3) Provide annually to critical staff for the petroleum pipeline operator, the public water provider, and state and local emergency response providers either direct training or funding for training by a third party.

Current official text: Arkansas General Assembly. Digitized from the UniCourt Code Improvement Commission public-domain capture. Reproduced from public-domain Arkansas statutes; confirm against the official source for the current text. Not legal advice.