Article
Groundwater Withdrawal Permits
- A.R.S. § 45-511— Definitions
- A.R.S. § 45-512— Categories of groundwater withdrawal permits
- A.R.S. § 45-513— Dewatering permit; definition; priorities for use of groundwater; conditions on director; duration of permit
- A.R.S. § 45-514— Mineral extraction and metallurgical processing permit; conditions for issuance; duration of permit
- A.R.S. § 45-515— General industrial use permits; conditions for issuance; duration of permit
- A.R.S. § 45-516— Poor quality groundwater withdrawal permit; conditions for issuance; duration of permit
- A.R.S. § 45-517— Temporary permit for electrical energy generation; conditions for issuance
- A.R.S. § 45-518— Temporary dewatering permit; extensions; emergency temporary dewatering permit; conditions for issuance
- A.R.S. § 45-519— Drainage water withdrawal permit; conditions for issuance
- A.R.S. § 45-519.01— Hydrologic testing permits; conditions for issuance
- A.R.S. § 45-520— Point of withdrawal; location of use; conveyance
- A.R.S. § 45-521— Permit application form; filing; contents
- A.R.S. § 45-522— Correction of application
- A.R.S. § 45-523— Notice; objections; hearing
- A.R.S. § 45-524— Approval or rejection of permit application
- A.R.S. § 45-525— Registry of permits; reporting
- A.R.S. § 45-526— Appeals
- A.R.S. § 45-527— Modification of permit
- A.R.S. § 45-528— Revocation of permits