Public-domain · open source
OpenJurist

Cal. Lab. Code § 7261

Structural Steel Framed Buildings

Added by Stats. 1970, Ch. 1498.

When gathering and stacking temporary floor plank on a lower floor, in preparation for transferring such plank for use on an upper working floor, the steel erector’s personnel shall remove such plank successively, working toward the last panel of such floor, so that the work is always being done from the planked floor.

Official source: California Legislative Information. Reproduced from public-domain California statutes; confirm against the official source for the current text. Not legal advice.