A utility may have more stringent requirements than set by law, including certification requirements for water distribution systems and domestic wastewater collection systems operations, except that a utility may not require a licensed contractor, as defined in s. 489.105(3) to have any additional license for work in water distribution systems or domestic wastewater collection systems.
Fla. Stat. § 403.868
Requirements by a utility
Known as the Florida Electric Transmission Line Siting Act
The act spans §§ 403–403 (336 sections).
History.--s. 8, ch. 97-236.
Official source: Online Sunshine (Florida Legislature). Reproduced from public-domain Florida statutes; confirm against the official source for the current text. Not legal advice.