Public-domain · open source
OpenJurist

O.C.G.A. § 22-3-80

Definitions

— Code 1981, § 22-3-80, enacted by Ga

As used in this article, the term:

(1) “Existing petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(2) “Expansion” shall have the same meaning as set forth in Code Section 12-17-1.

(3) “Extension” shall have the same meaning as set forth in Code Section 12-17-1.

(4) “Maintenance” shall have the same meaning as set forth in Code Section 12-17-1.

(5) “New petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(6) “Parallel petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(7) “Petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(8) “Petroleum pipeline company” shall have the same meaning as set forth in Code Section 12-17-1.

Current official text: Official Code of Georgia Annotated (LexisNexis). Digitized from the Internet Archive scan of the OCGA. Reproduced from public-domain Georgia statutes; confirm against the official source for the current text. Not legal advice.