Public-domain · open source
OpenJurist

Idaho Code § 43-1121

Notice of proposed construction of distribution system — Time for filing written request

I.C., § 43-1121, as added by 1993, ch. 209, § 2, p. 570.

Prior to construction of a distribution system under the authority of either section 43-329 or 43-333, Idaho Code, or under any law authorizing a local improvement district, an irrigation district shall mail a notice of the intended construction to the current owner of any lot or parcel within the area to which irrigation water can be delivered by that distribution system, which previously had been excluded from the district as not agricultural. The notice shall state that the lot or parcel may be eligible for reinstatement, with water rights, if the owner so requests in writing, properly signed and acknowledged, and shall specify the date, not less than three (3) weeks after mailing of the notice, after which the irrigation district may decline to consider the request.

Current official text: Idaho Statutes (Idaho Legislature). Digitized from the UniCourt Code Improvement Commission public-domain capture. Reproduced from public-domain Idaho statutes; confirm against the official source for the current text. Not legal advice.