At all mines where hoisting is done by cage from 2 or more levels a person shall be employed whose duties shall be to load and unload the cage and to give the signals to the hoisting engineer. The superintendent shall be responsible for the enforcement of this rule.
225 ILCS 710/45.05
Loading and unloading cage
Known as the Fluorspar Mines Act
The act spans §§ 225-710-1 to 225-710-9-02 (122 sections).
P.A. 87-1133.
Official source: Illinois General Assembly. Reproduced from public-domain Illinois statutes; confirm against the official source for the current text. Not legal advice.