Fees for special permits for vehicles or vehicle combinations exceeding the legal sizes and weights specified in this Chapter either empty or hauling material directly across a highway making repeated moves in the course of industrial operations, for a period of 6 months; limited continuous operation permit only, $15.
625 ILCS 5/15-309
Fees for Moves Directly across Highway
P.A. 81-199.
Official source: Illinois General Assembly. Reproduced from public-domain Illinois statutes; confirm against the official source for the current text. Not legal advice.