Public-domain · open source
OpenJurist

Ind. Code § 20-26-7-46

Requirements for contracts as a design professional for a controlled project

As added by P.L.179-2016, SEC.8

Sec. 46. A person, organization, or other entity that enters into a contract or an agreement with a school corporation to conduct a feasibility or cost study to assist the school corporation in determining the cost of a controlled project as described in IC 6-1.1-20-3.1(a) or IC 6-1.1-20-3.5(a) may not enter into a contract or agreement as the design professional on the controlled project with the school corporation to complete any part of the controlled project design unless the person, entity, or organization is awarded a contract as the design professional for the controlled project under IC 5-16-11.1.

Official source: Indiana General Assembly. Reproduced from public-domain Indiana statutes; confirm against the official source for the current text. Not legal advice.