Ind. Code § 36-9-27-103

Construction, reconstruction, or maintenance projects for regulated drains; hearings required

As added by Acts 1981, P.L.309, SEC.101

Sec. 103. Notwithstanding any other provision of this chapter, after the establishment of a cumulative drainage fund, a hearing shall be held before the board undertakes any project to construct or reconstruct a regulated drain or to maintain a regulated drain when the total cost of the maintenance project is more than twenty-five thousand dollars ($25,000). The board shall:

(1) publish a notice of the hearing in accordance with IC 5-3-1; and

(2) mail a notice of the hearing, at least fifteen (15) days before the hearing, to the owner of each piece of property adjoining the proposed or established regulated drain.