Unless otherwise required in a municipal ordinance or regulation, when any excavation is made in any paved public highway and the pavement is laid on a concrete base, the excavation must have the pavement and concrete cut back on each side of the excavation ditch a distance of 8 inches, and in issuing the permits for cutting the pavement this extra width must be charged to the person applying for the permits.
Me. Rev. Stat. tit. 23, § 3359
Minimum excavation for pavement on a concrete base
PL 1999, c. 337, §10 (AMD).
Official source: Maine Legislature. Reproduced from public-domain Maine statutes; confirm against the official source for the current text. Not legal advice.