Public-domain · open source
OpenJurist

Me. Rev. Stat. tit. 25, § 2923-C

Cost reporting

PL 2023, c. 609, §3 (NEW)

1. Reporting requirements. Annually, on a date prescribed by the Public Utilities Commission by rule, a public safety answering point and dispatch center shall each provide the bureau with a report of the costs incurred by the public safety answering point or dispatch center for the provision of 9-1-1 services.

2. Rules. The Public Utilities Commission shall adopt rules to implement this section. The rules must establish requirements for the report provided by a public safety answering point and dispatch center pursuant to subsection 1, including, at a minimum:

A. The manner by which the report must be submitted to the bureau;

B. The specific cost components for the provision of 9-1-1 services to be included in the report; and

C. The date by which the report must be submitted.

Rules adopted pursuant to this subsection are routine technical rules pursuant to Title 5, chapter 375, subchapter 2‑A.

Official source: Maine Legislature. Reproduced from public-domain Maine statutes; confirm against the official source for the current text. Not legal advice.