Public-domain · open source
OpenJurist

Neb. Rev. Stat. § 48-425

Scaffolds or staging; safety requirements

Applied in 5 court decisions — leading case Oddo v. Speedway Scaffold Co. (1989)

Most recently applied in Eastlick v. Lueder Construction Co. (November 2007)

Laws 1911, c. 65, § 1, p. 289; R.S.1913, § 3602; Laws 1919, c. 190, tit

How often courts cite this section

198919902000200710
citing decisions per year

Court decisions citing this, by year. The dip in the last several years is a data-coverage gap, not a real trend — our corpus holds fewer opinions from the most recent years, so recent citations are undercounted.

All scaffolds, hoists, cranes, stays, ladders, supports or other mechanical contrivances used in the erection, repairing, alteration, removal or painting of any house, building, bridge, viaduct or other structure, shall be erected and constructed in a safe, suitable and proper manner. Scaffolding or staging, swung or suspended from an overhead support and more than twenty feet from the ground floor, shall have, where practicable, a safety rail properly bolted, secured and braced, rising at least thirty-four inches above the floor or main portion of such scaffolding or staging, and extending along the entire length of the outside and ends thereof and properly attached thereto, and such scaffolding and staging shall be so fastened as to prevent the same from swaying from the building or structure.

Official source: Nebraska Legislature. Reproduced from public-domain Nebraska statutes; confirm against the official source for the current text. Not legal advice.