NRS 704.771

“Net metering system” defined

Known as the Utility Environmental Protection Act

The act spans §§ 704–704 (414 sections).

(Added to NRS by 1997, 777; A 2001, 3253; 2003, 1874; 2005, 1816; 2007, 3003; 2011, 1941; 2025, 1733)

1. “Net metering system” means:

(a) A facility or energy system for the generation of electricity that:

(1) Uses renewable energy as its primary source of energy to generate electricity;

(2) Has a generating capacity of not more than 1 megawatt;

(3) Is located on the customer-generator’s premises;

(4) Operates in parallel with the utility’s transmission and distribution facilities; and

(5) Is intended primarily to offset part or all of the customer-generator’s requirements for electricity;

(b) A facility or energy system for the generation of electricity that:

(1) Uses waterpower as its primary source of energy to generate electricity;

(2) Is located on property owned by the customer-generator;

(3) Has a generating capacity of not more than 1 megawatt;

(4) Generates electricity that is delivered to the transmission and distribution facilities of the utility; and

(5) Is intended primarily to offset all or part of the customer-generator’s requirements for electricity on that property or contiguous property owned by the customer-generator;

(c) A facility or energy system for the generation of electricity:

(1) Which uses wind power as its primary source of energy to generate electricity;

(2) Which is located on property owned or leased by an institution of higher education in this State;

(3) Which has a generating capacity of not more than 1 megawatt;

(4) Which operates in parallel with the utility’s transmission and distribution facilities;

(5) Which is intended primarily to offset all or part of the customer-generator’s requirements for electricity on that property or on contiguous property owned or leased by the customer-generator;

(6) Which is used for research and workforce training; and

(7) The construction or installation of which is commenced on or before December 31, 2011, and is completed on or before December 31, 2012; or

(d) A solar-powered affordable housing system.

2. The term does not include a facility or energy system for the generation of electricity, other than a solar-powered affordable housing system, which has a generating capacity that exceeds the greater of:

(a) The limit on the demand that the class of customer of the customer-generator may place on the system of the utility; or

(b) One hundred percent of the customer-generator’s annual requirements for electricity.

Official source: Nevada Legislature. Reproduced from public-domain Nevada statutes; confirm against the official source for the current text. Not legal advice.