Public-domain · open source
OpenJurist

Ohio Rev. Code Ann. § 156.02

Contract for report containing analysis and recommendations pertaining to implementation of energy conservation measures

Effective: September 29, 2015; Latest Legislation: House Bill 64 - 131st General Assembly

The executive director of the Ohio facilities construction commission may, on the executive director's own initiative or at the request of a state agency, contract with an energy or a water services company, architect, professional engineer, contractor, or other person experienced in the design and implementation of energy or water conservation measures for a report containing an analysis and recommendations pertaining to the implementation of energy or water conservation measures that result in energy, water, or wastewater cost savings, operating cost savings, or avoided capital costs for the institution. The report shall include estimates of all costs of such installations, including the costs of design, engineering, installation, maintenance, repairs, and debt service, and estimates of the energy, water, or wastewater cost savings, operating cost savings, and avoided capital costs created.

Official source: Ohio Laws & Administrative Rules (Legislative Service Commission). Reproduced from public-domain Ohio statutes; confirm against the official source for the current text. Not legal advice.