Ohio Rev. Code Ann. § 3781.32

Connections or tie-ins within right-of-way

Effective: March 27, 2013; Latest Legislation: House Bill 458 - 129th General Assembly

(A) Any connections or tie-ins to existing utility services within a public right-of-way shall comply with permit requirements of the public authority that has jurisdiction over that right-of-way.

(B) A developer or the designer employed by the developer shall not require, as a condition for entering into a contract for a project that will require excavation, that responsibility for performance of duties imposed under sections 3781.25 to 3781.32 of the Revised Code shall be assumed by a person other than the person on whom those duties are imposed under those sections. This division does not prohibit a utility from entering into any contract for the performance of duties that are imposed on a utility under those sections.

(C) Nothing in sections 3728.25 to 3728.32 of the Revised Code shall be construed to require a utility to relocate its underground utility facilities located at an excavation site.

Official source: Ohio Laws & Administrative Rules (Legislative Service Commission). Reproduced from public-domain Ohio statutes; confirm against the official source for the current text. Not legal advice.