Public-domain · open source
OpenJurist

ORS 537.885

Known as the Ground Water Act

The act spans §§ 537–537 (229 sections).

2009 c.767 §3

The person responsible for the drilling of a geotechnical hole for which a report is required under ORS 537.880 must have:

(1) A current monitoring well constructor’s license as specified in rules adopted by the Water Resources Commission;

(2) A current water supply well constructor’s license as specified in rules adopted by the commission;

(3) A current certificate of registration as a geologist issued under ORS 672.505 to 672.705; or

(4) A current certificate of registration as an engineer issued under ORS 672.002 to 672.325.

Official source: Oregon State Legislature. Reproduced from public-domain Oregon statutes; confirm against the official source for the current text. Not legal advice.