Whenever a percolation test and/or ground water determination is required on any property within this state, the registered professional engineer or registered surveyor conducting the tests shall notify the city or town engineering department where the tests are to be taken, in writing, of the date and location of the tests, at least seven (7) days prior to the taking of the tests.
R.I. Gen. Laws § 23-19.2-11
Percolation tests and ground water determinations
P.L. 1926, ch. 85, § 1; G.L. 1923, § 23-19-11; P.L. 1979, ch. 39, § 1; G.L. 1956, § 23-19.2-11.
Official source: Rhode Island General Assembly. Reproduced from public-domain Rhode Island statutes; confirm against the official source for the current text. Not legal advice.