Public-domain · open source
OpenJurist

S.C. Code Ann. § 49-17-1070

Plans for time and manner of crossing railroad right of way

1962 Code SECTION 18-277; 1952 Code SECTION 18-277; 1942 Code SECTION 6123; 1932 Code SECTION 6123; Civ

After the contract is let and the actual construction is commenced, if the work is being done with a floating dredge the superintendent in charge of construction shall notify any railroad company the right of way of which is to be crossed by the work of the probable time at which the contractor will be ready to enter upon the right of way of the road and construct the work thereon. The railroad shall send a representative to view the ground with the superintendent of construction and arrange the exact time at which such work can be most conveniently done.

Official source: South Carolina Legislature. Reproduced from public-domain South Carolina statutes; confirm against the official source for the current text. Not legal advice.