Public-domain · open source
OpenJurist

S.C. Code Ann. § 49-4-130

Notice of construction of new surface water intake required

1982 Act No. 282, SECTION 3; 1993 Act No. 181, SECTION 1245; 2000 Act No. 366, SECTION 1; Formerly 1976 Code SECTION 49-4-70; 2010 Act No. 247, SECTION 1, eff January 1, 2011.

A surface water withdrawer must provide the department with prior written notice of the construction of a new surface water intake that changes the method of measuring the water the permittee is withdrawing, cessation of its surface water withdrawals, a proposed change in ownership, or the abandonment of a surface water intake.

Official source: South Carolina Legislature. Reproduced from public-domain South Carolina statutes; confirm against the official source for the current text. Not legal advice.