Public-domain · open source
OpenJurist

S.D. Codified Laws § 46A-10A-79

Apportionment of original cost to annexed area when project extended

Source: SL 1985, ch 362, § 80.

If an existing drainage project is extended or enlarged, the board or boards shall apportion the benefits resulting to the annexed area from the existing construction in the original project as a cost to be absorbed by the lands of the annexed area on the basis of the original cost of the drain.

Official source: South Dakota Legislature. Reproduced from public-domain South Dakota statutes; confirm against the official source for the current text. Not legal advice.