At the well site, the operator shall take measures to prevent or minimize soil erosion and pollution of surface waters during the life of the operation. Such measures shall include sediment ponds, berms, diversion ditches, hay bales, and other measures designed to prevent erosion and discharge of pollutants from the well site.
Tenn. Code Ann. § 60-1-701
Measures by operator at well site
Acts 1987, ch. 257, § 3.
Current official text: Tennessee Code (LexisNexis). Digitized from the UniCourt Code Improvement Commission public-domain capture. Reproduced from public-domain Tennessee statutes; confirm against the official source for the current text. Not legal advice.