The duty of distributing the waters of and operating the flood control project when completed shall rest upon the state engineer described in Section 73-2-1, provided, that the cost of such distribution and operation of the project by the state engineer shall be borne by the county entering into the cooperative contract with the United States of America for the construction and the operation of the flood control project.
Utah Code § 17-78-303
Distribution of waters -- Operation of projects
Renumbered and Amended by Chapter 14, 2025 Special Session 1
Official source: Utah State Legislature. Reproduced from public-domain Utah statutes; confirm against the official source for the current text. Not legal advice.