Public-domain · open source
OpenJurist

RCW 20.01.510

Processor's form showing maximum processing capacity.

2011 c 336 s 589; 2011 c 103 s 41; 1971 ex.s. c 182 s 16.

In order to carry out the purposes of this chapter, the director may require a processor to annually complete a form prescribed by the director, which, when completed, will show the maximum processing capacity of each plant operated by the processor in the state of Washington. Such completed form shall be returned to the director by a date prescribed by him or her.

Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.