Cities and towns are authorized to charge property owners seeking to connect to the water or sewerage system of the city or town as a condition to granting the right to so connect, in addition to the cost of such connection, such reasonable connection charge as the legislative body of the city or town shall determine proper in order that such property owners shall bear their equitable share of the cost of such system. The equitable share may include interest charges applied from the date of construction of the water or sewer system until the connection, or for a period not to exceed ten years, at a rate commensurate with the rate of interest applicable to the city or town at the time of construction or major rehabilitation of the water or sewer system, or at the time of installation of the water or sewer lines to which the property owner is seeking to connect but not to exceed ten percent per year: PROVIDED, That the aggregate amount of interest shall not exceed the equitable share of the cost of the system allocated to such property owners. Connection charges collected shall be considered revenue of such system.
RCW 35.92.025
Authority to make charges for connecting to water or sewerage system—Interest charges.
Applied in 14 court decisions — leading case Landmark Development, Inc. v. City of Roy (1999)
Most recently applied in City Of Issaquah, V. Westridge-issaquah Ii Lp (December 2021)
1985 c 445 s 6; 1965 c 7 s 35.92.025
How often courts cite this section
Court decisions citing this, by year. The dip in the last several years is a data-coverage gap, not a real trend — our corpus holds fewer opinions from the most recent years, so recent citations are undercounted.
Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.