Public-domain · open source
OpenJurist

RCW 36.21.070

New construction building permits—Appraisal of building.

1989 c 246 s 3; 1987 c 134 s 1; 1963 c 4 s 36.21.070

Upon receipt of a copy of a building permit, the county assessor shall, within twelve months of the date of issue of such permit, proceed to make a physical appraisal of the building or buildings covered by the permit.

Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.