The legislative authority of every county operating ferries shall prepare, with the advice and assistance of the county engineer, a fourteen year long range capital improvement plan embracing all major elements of the ferry system. Such plan shall include a listing of each major element of the system showing its estimated current value, its estimated replacement cost, and its amortization period.
RCW 36.54.015
Ferries—Fourteen year long range improvement plan—Contents.
1975 1st ex.s. c 21 s 2.
Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.