Public-domain · open source
OpenJurist

RCW 68.24.180

Opening of roads, railroads through cemetery—Consent required.

2005 c 365 s 84; 1994 c 273 s 20; 1984 c 7 s 369; 1959 c 217 s 1; 1947 c 69 s 1; 1943 c 247 s 69; Rem

After dedication under this title, and as long as the property remains dedicated to cemetery purposes, a railroad, street, road, alley, pipe line, pole line, or other public thoroughfare or utility shall not be laid out, through, over, or across any part of it without the consent of the cemetery authority or of not less than two-thirds of the owners of plots or rights of interment.

Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.