Public-domain · open source
OpenJurist

RCW 77.100.120

Cedar river spawning channel—Specifications.

Applied in 1 court decision — leading case 139 Wash. App. 728 - Glasser v. City of Seattle, Office of Hearing Examiner (2007)

Most recently applied in 139 Wash. App. 728 - Glasser v. City of Seattle, Office of Hearing Examiner (June 2007)

1989 c 85 s 5

The channel shall be designed to produce, at a minimum, fry comparable in quality to those produced in the Cedar river and equal in number to what could be produced naturally by the estimated two hundred sixty-two thousand adults that could have spawned upstream of the Landsburg diversion. Construction of the spawning channel shall commence no later than September 1, 1990. Initial construction size shall be adequate to produce fifty percent or more of the production goal specified in this section.

Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.