Chapter
CONSTRUCTION PROJECTS IN STATE WATERS
- RCW 77.55.011— Definitions.
- RCW 77.55.021— Permit.
- RCW 77.55.031— Driving across established ford.
- RCW 77.55.041— Derelict fishing, crab, and other shellfish gear—Removal.
- RCW 77.55.051— Spartina/purple loosestrife—Removal or control.
- RCW 77.55.061— Hazardous substance remedial actions—Procedural requirements not applicable.
- RCW 77.55.081— Removal or control of aquatic noxious weeds—Rules—Pamphlet.
- RCW 77.55.091— Small scale prospecting and mining—Rules.
- RCW 77.55.101— Environmental excellence program agreements—Effect on chapter.
- RCW 77.55.111— Habitat incentives agreement.
- RCW 77.55.121— Habitat incentives program—Goal—Requirements of agreement—Application evaluation factors.
- RCW 77.55.131— Dike vegetation management guidelines—Memorandum of agreement.
- RCW 77.55.151— Permit issued to a marina or marine terminal for regular maintenance activities.
- RCW 77.55.161— Stormwater discharges.
- RCW 77.55.171— Watershed restoration projects—Permit processing.
- RCW 77.55.181— Fish habitat enhancement project—Permit review and approval process—Fees—Limitation of liability.
- RCW 77.55.191— Columbia river anadromous fish sanctuary—Restrictions.
- RCW 77.55.201— Landscape management plan.
- RCW 77.55.211— Informational brochure.
- RCW 77.55.221— Flood damage repair and reduction activities—Five-year maintenance permit agreements.
- RCW 77.55.231— Conditions imposed upon a permit—Reasonably related to project—Least impactful modifications—Minor modifications to plans/work timing.
- RCW 77.55.241— Off-site mitigation.
- RCW 77.55.251— Mitigation plan review.
- RCW 77.55.261— Placement of woody debris as condition of permit.
- RCW 77.55.271— Sediment dredging or capping actions—Dredging of existing channels and berthing areas—Mitigation not required.
- RCW 77.55.281— Fishways on certain agricultural drainage facilities.
- RCW 77.55.331— Hydraulic project approval account.
- RCW 77.55.341— Department to prepare and distribute information to the public.
- RCW 77.55.351— Department to develop system to provide access to hydraulic project approval applications.
- RCW 77.55.361— Limitations of chapter to a forest practices hydraulic project—Adoption of rules for concurrent review process—Department's duties regarding chapter 76.09 RCW.
- RCW 77.55.371— Memorandum of agreement to implement integration of hydraulic project approvals into forest practices applications—Interagency contract.
- RCW 77.55.400— Determination as to whether construction is a hydraulic project—Preapplication determination—Review and comment period—Written determination.
- RCW 77.55.410— Violation of chapter.
- RCW 77.55.420— Stop work order—Notice—Appeal.
- RCW 77.55.430— Notice to comply—Notice—Appeal.
- RCW 77.55.440— Penalties—Notice—Appeal—Authority of attorney general to recover penalty—Penalty schedule.
- RCW 77.55.450— Administrative inspection warrant.
- RCW 77.55.460— Disapproval of an application—Notice—Review.
- RCW 77.55.470— Remedies under chapter not exclusive.