Public-domain · open source
OpenJurist

RCW 78.60.250

Violations—Modification of permit, when necessary—Departmental order—Issuance—Appeal.

Known as the Geothermal Resources Act

The act spans §§ 78.60.010 to 78.60.300 (30 sections).

2013 c 23 s 256; 1974 ex.s. c 43 s 25

Whenever it appears with probable cause to the department that:

(1) A violation of any provision of this chapter, regulation adopted pursuant thereto, or condition of a permit issued pursuant to this chapter has occurred or is about to occur, or

(2) That a modification of a permit is deemed necessary to carry out the purpose of this chapter,

the department shall issue a written order in person to the operator or his or her employees or agents, or by certified mail, concerning the drilling, testing, or other operation conducted with respect to any well drilled, in the process of being drilled, or in the process of being abandoned or in the process of reclamation or restoration, and the operator, owner, or designated agent of either shall comply with the terms of the order and may appeal from the order in the manner provided for in RCW 78.60.280. When the department deems necessary, the order may include a shutdown order to remain in effect until the deficiency is corrected.

Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.