Public-domain · open source
OpenJurist

RCW 90.40.090

Permit for Grand Coulee project.

1988 c 127 s 83; 1933 ex.s. c 13 s 4; RRS s 7399-1, pocket part.

An application filed by the department of ecology or its assignee, the United States Bureau of Reclamation, for a permit to appropriate waters of the Columbia River under chapter 90.03 RCW, for the development of the Grand Coulee project shall be perfected in the same manner and to the same extent as though such appropriation had been made by a private person, corporation or association, but no fees, as provided for in RCW 90.03.470, shall be required.

Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.