Well Abandonment Act
Illinois · Professions, Occupations, and Business Operations · §§ 225-730-0-01 to 225-730-4 · 5 sections
Sections covered
- 225 ILCS 730/0.01Short title
- 225 ILCS 730/1It is the duty of the permittee of any well drilled or deepened for oil or gas, to file all geophysical logs and a well drilling report of said well in the office of the State Geological Survey of the University of Illinois within 90 days after drilling ceases
- 225 ILCS 730/2Professions, Occupations, and Business Operations › 225 ILCS 730 — Well Abandonment Act
- 225 ILCS 730/3Professions, Occupations, and Business Operations › 225 ILCS 730 — Well Abandonment Act
- 225 ILCS 730/4The Geological Survey shall issue a receipt for each geophysical log and well drilling report within 15 days of receipt of the geophysical log or well drilling report
Download
Copy
Embed on your site
Hover to preview · click to copy the code