¶1— Appellees filed their petition in the Starke Circuit Court to establish a levee in Starke county, under the act of 1907, as amended in 1911, Acts 1907 p. 404; Acts 1911 pp. 172, 668; §8188 et seq. Burns 1914. The petition was referred to three commissioners for preliminary report. Before the time fixed for filing the report, one of the commissioners died, but the other two signed and filed a report on February 7, 1914, recommending the establishment of the proposed work. This report on motion was set aside, without objection from any one, and the petition was again referred to three commissioners, who, on January 6, 1915, filed a preliminary report finding the proposed work practicable and sufficient to protect the lands affected, and that it would improve the public health, benefit highways and be of public utility. §8189 Burns 1914, Acts 1907 p. 405. Appellants filed various objections and exceptions to the preliminary report, motions to dismiss the proceedings and, with others, filed what purported to be a two-thirds remonstrance, which was overruled. There was a hearing on appellant’s exceptions to the preliminary report, with special findings of fact and *66conclusions of law thereon. The appellants excepted to the conclusions of law. The court rendered judgment referring the report back to the commissioners for a final report. Erom such judgment, this appeal is prosecuted. §8189, supra. Appellees have interposed a motion to dismiss the appeal. The motion is insufficient, and is overruled.
¶2
¶3In March, 1902, landowners in Starke and Laporte counties formed a corporation under the act approved March 5, 1889, as amended by* an act approved March 14, 1895 (§§7202-7230 Burns 1901, Acts 1889 p. 104; Acts 1895p.376), to protect lands from overflow by the Kankakee river and its tributaries and to drain the same. The name adopted was the Kankakee Reclamation Company. The company subsequently constructed a dredge *68ditch in a northeasterly and southwesterly direction along the line of the Kankakee river, which received the waters of the Elsbree and other ditches. ■ About a mile and a half north of the Elsbree ditch and parallel therewith, is the Laramore ditch, flowing westward, and emptying into the Reclamation company’s ditch. Two and a half miles south of the Elsbree ditch, and parallel therewith, is the Williams ditch, flowing west, and emptying into the Reclamation company’s ditch. In this proceeding, the proposed north levee will extend west from the railroad embankment on a line from 100 to 200 feet north of the Elsbree ditch to a point 1,100 feet east of the Reclamation company’s ditch; thence in a northeasterly direction, parallel with said company ditch, to near the south bank of the Laramore ditch; thence east, parallel with said ditch, a distance of more than one mile. The proposed south levee extends from the railroad embankment west, at a distance from the south bank of the Elsbree ditch from 100 to 200 feet, to a point 1,500 feet east of the Reclamation company’s ditch, thence in a southwesterly direction and parallel with the Reclamation company’s ditch, to the north bank of the Williams ditch; thence east, on a line parallel with the Williams ditch, a distance of more than three miles. Where the levees extend along the banks of the Elsbree ditch, it is proposed to secure the materials therefor from the banks and bottom of the Elsbree ditch, and thereby widen, deepen and straiten the channel thereof. On this portion of the work, a thirty-foot berme between the toe of each levee and the Elsbree ditch is proposed. The materials for the levees adjoining the Williams and Laramore ditches are. to be procured by widening, straitening and deepening those ditches. Materials for the portions of *69levees running parallel with the Reclamation company’s ditch are to be taken from shallow pits near the levees. All the lands affected by the proposed work were formerly assessed for the construction of the Reclamation company’s ditch. Section 3 of the original act, supra, as passed in 1907, made no direct mention of ditches,, but the amendment of 1911 (supra, p. 172) expressly enacts that the commissioners may make provision to “straighten, widen and deepen any … ditch heretofore constructed so as to provide for complete protection of all the lands to be affected.” Appellants claim that this provision is void because in conflict with §19, Art. 4, of the Constitution of Indiana, which provides that “every act shall embrace but one subject and matters properly connected therewith, which subject shall be expressed in the title.” The title of the levee act (Acts 1907 p. 404, supra) is, “An act to provide for the protection and reclamation of lands subject to over-flow, by the construction and maintenance of levees.” The same legislature passed our drainage law, entitled, “An act concerning drainage.” Acts 1907 p. 508, §6140 Burns 1914. Section 3 of that act (§6142 Burns 1914) authorized the commissioners to provide for dykes and levees where appropriate.
¶4
¶5It is further contended by appellants that the proposed work is merely the construction of a new ditch, with the levees as mere incidents thereto, and that such proceeding must be instituted under the Drainage Act, because the Levee Act is not applicable to the construction of new ditches. Whether a new ditch might be constructed under the Levee Act we do not consider. The work proposed here is in no sense a new ditch, but falls within the express language of the statute providing for the straitening, widening and deepening of an existing ditch.
¶6
¶7
¶8
¶9elaboration of a point is not proper in the statement of points, mere general statements, without specific and definite reasons specifically applied, present no question for decision.” Point No. 18 has the same infirmity as point No. 16.
¶10The trial court did not err in its conclusions of law on the facts found. Judgment affirmed.
¶11Note. — Reported in 113 N. E. 376. See under (4) 4 C. J. 1353, 3 Cyc 517; (6) 36 Cyc 1022, 1028.