Public-domain · open source
OpenJurist

82 F. 550

Docket No. 382.

Peirce v. Clavin

Seventh Circuit Court of Appeals

Decided October 4, 1897.)

Seventh Circuit Court of Appeals · decided 1897-10-04

<p>■ In Error to the Circuit Court of tbe United States for the Southern District of Illinois.</p> <p>The defendant in error, William M. Olavin, brought action in trespass to recover of the plaintiff in error for damages sustained to his person on the 25th day of December, 1895. Olavin on the 4th day of June, 1895, entered the service of the receiver of the Toledo, St. Louis & Kansas City Railroad Company 'as a switchman in the railroad yards at Madison and East St. Louis, in the state of Illinois. He was not a member of any regular crew, but was an extra . man, required to take the place of any one of the crew who might be absent from his work. A single track led from the Madison yard to the East St. . Louis yard, passing over a short trestle, beyond which, in the East St. Louis yard, delivery tracks to connecting roads, six in all, branched out from it to the south; the first of them being known as the “Belt” or “Wiggins’ Ferry” track, the other five being numbered from 1 to 5, consecutively. The switch stand and lever operating the switch to the Wiggins’ Perry track was situated at the west end of the trestle, north of the lead or main track. This switch was a ground switch. It was worked by a lever pivoted in the switch stand a short distance iroin die rail, and was operated at right angles to the rail. The end or handhold of the lever was in the shape of a loop 7 inches long, 2% inches wide, and was originally designed to drop between the ties when thrown over towards the rail, and to rest niton the ground, which would bring the top of it below the level of the tie, the loop or handhold being from 8 to 12 inches distant from (lie rail. In March, 1805, the lever of the switch had become bent, from being caught in the tank step of a switch engine. This caused the handhold, when the lever was thrown towards the rail, to rest upon one of the ties, exposing the whole of the handhold above the level of the gionnd. At about 4:30 p. m. on the day of the accident, the crew with which Clavin was thou working brought a train of cars from the Madison yard for delivery in the East St. Louis yard, 15 cars of which train were to be delivered to the “bridge track,” and the remaining 20 in the lower yard. Clavin was on top of one of this string of 20 cars, and, when the engine first went into the lower yard, tins string was kicked or pushed down over the trestle, Clavin bringing them to a stop, and the engine then delivered (he 15 cars to the “bridge yard,” and re-1 aimed, and was reattached to the string of cars on which Clavin was working. Clavin cut off two cars, and, as the engine was pushing them forward, ran altead, to throw Them upon the Wiggins’ Ferry track. He threw the switch in question, that the cars might run in upon the Wiggins’ Perry track. To do this he was obliged to ca ieh the handhold, lift the lever, and throw it away from the rails. This lie did, sotting his foot upon it, to press it down. The two cars passed over the switch, Clavin gave the engineer the signal to stop, and immediately upon the passage of the cars threw the lever back, resetting the switch for the lead or main track, and again putting his foot upon it to bring it down into place. The next car was to be delivered to wliat is known as the “house •track.” Clavin went to where the train stood, gave the engineer a signal to go ahead, stopped in between the last two cars to pull the pin, walking with one foot over the rail between the moving cars. Tic» found the pins in the draw-liars of both cars .lammed, and was in the act of stepping out from the car to get a tool with which to knock them out, when in passing over the switch in question his foot caught in fho handhold, which rested upon the tie, and he was ¡brown to the ground in front of the truck, one car passing over his left hand, nearly severing it at the wrist, rendering amputation necessary. Clavin, while in the service of the receiver, had worked with the crews of both yards,— that is, with the crews that delivered east-bound freight to the Madison yard and west-bound freight into the East St. Louis yard. The condition of the switch was known to most of the crews, but its condition had nevei been reported. On an average of once a day, cars were delivered to the East St. Louis yard, and placed upon the various delivery tracks, passing over and using tiie switch in question. Clavin, while he was in the service Of the receiver, had been a member of the East: St. Louis crew for six whole days. He nad also worked for a considerable period with ilie night crew, doing work in both the upper and lower yards.</p> <p>At the conclusion of the evidence, ihe court was requested to direct a verdict for the defendant, which request was overruled, and an exception reserved. A number of instructions bearing upon the question of assumption of risk were requested by the plaintiff in error to be given in charge to the jury, which were refused, and which are not necessary to be here stated, but are considered in the opinion of the court. To the charge of the court to the jury the following errors, so far as it is deemed necessary to state them, are assigned: First. “The defendant undertook, by the law of the land, — not probably in words,— undertook to furnish to the plaintiff reasonable and safe appliances with which to carry on his work of switching.” Second. “If he [the plaintiff] did have notice that it was out of repair, or, by the exercise of reasonable diligence could have known that it was out of repair, then a higher degree of diligence was required at his hand than if he had no such notice. More care in going about a place of danger is required by the pleadings and your experience and common sense than going about a place where no danger is known or supposed to exist. As to whether he had notice, the evidence will determine, and you are the judges of that evidence.”</p> <p>There was a verdict for the plaintiff below, and the case is brought here for review.</p>

2 counsel of record

Key passage — most relied on by later courts

““The court below ignored wholly the doctrine of assumption of risk, and refused the instructions requested in that behalf, erroneously supposing that absolute knowledge of the defect which existed during the entire time of his service could not, under any circumstances, amount to an assumption of risk, but merely cast upon him greater care in the use, or in avoiding danger from the defective appliance. This is manifest error, for which we think the judgment must be reversed. The doctrine of assumption of risk is not to be confounded with the doctrine of contributory negligence; for, where the former doctrine is applicable, the servant may exercise the greatest care, and yet be precluded from recovery for an injury in the performance of his service, because fhe risk was assumed. Miner v. Railroad Co., 153 Mass. 398 , 26 N. E. 994 .””

quoted by 1 later decision, including St. Louis Cordage Co. v. Miller

Relies on Randall v. Baltimore O R · Dorsey v. Phillips & Colby Construction Co. · Miner v. Connecticut River Railroad

Good law ✅— No negative treatment on recordhow we know

Decided 1897-10-04

How this case has been cited

Cited by 6 later decisions — most recently January 1916

5 federal appellate ·

30189719001910decided

Later decisions citing this case, by decade. The current decade is in progress, and our corpus holds fewer opinions from the most recent years, so the latest bars are undercounted — not a real decline.

View the full empirical analysis of this case →

¶11. Master and Servant — Save Appliances — instructions—Harmless Error

¶2An instruction making it the absolute duty of the master to provide reasonable and safe appliances, instead of to use reasonable care to furnish such appliances, is erroneous; but the error is harmless where the defect complained of is so obvious, and of such long standing, that a failure to remedy it was manifest negligence.

¶32. Same — Assumption op Risks — Presumption op Knowledge op Defects by Servant.

¶4The loop handle of a railway switch lever became bent, so that when thrown over between the tracks, instead of falling between the ties, it rested on top of a tie, exposing the loop above the level thereof. Plaintiff was injured by catching his foot in the loop while switching cars. Ho liad been engaged about the yard as a member of a switching crew for six days, but worked mainly at night, and in his testimony denied any knowledge of the defect. Sold, that the coiu't was not warranted in presuming, as matter of law, that he' had knowledge of such defect, but, in view of his denial, should have submitted the question to the jury; especially as the attention of one engaged in switching trains is properly fixed upon his work. s<5 that he may well overlook defects in the roadbed.

¶5•8. Same — Assumption op Risk — Knowledge op Defect.

¶6A servant, having absolute knowledge of an obvious defect existing during the entire time of his service, assumes the risks thereof, and is not merely required to exercise greater care to avoid danger from the defect.

¶7■ In Error to the Circuit Court of tbe United States for the Southern District of Illinois.

¶8The defendant in error, William M. Olavin, brought action in trespass to recover of the plaintiff in error for damages sustained to his person on the 25th day of December, 1895. Olavin on the 4th day of June, 1895, entered the service of the receiver of the Toledo, St. Louis & Kansas City Railroad Company 'as a switchman in the railroad yards at Madison and East St. Louis, in the state of Illinois. He was not a member of any regular crew, but was an extra . man, required to take the place of any one of the crew who might be absent from his work. A single track led from the Madison yard to the East St. . Louis yard, passing over a short trestle, beyond which, in the East St. Louis yard, delivery tracks to connecting roads, six in all, branched out from it to the south; the first of them being known as the “Belt” or “Wiggins’ Ferry” track, the other five being numbered from 1 to 5, consecutively. The switch stand and lever operating the switch to the Wiggins’ Perry track was situated at the west end of the trestle, north of the lead or main track. This switch was a ground switch. It was worked by a lever pivoted in the switch stand a short *551distance iroin die rail, and was operated at right angles to the rail. The end or handhold of the lever was in the shape of a loop 7 inches long, 2% inches wide, and was originally designed to drop between the ties when thrown over towards the rail, and to rest niton the ground, which would bring the top of it below the level of the tie, the loop or handhold being from 8 to 12 inches distant from (lie rail. In March, 1805, the lever of the switch had become bent, from being caught in the tank step of a switch engine. This caused the handhold, when the lever was thrown towards the rail, to rest upon one of the ties, exposing the whole of the handhold above the level of the gionnd. At about 4:30 p. m. on the day of the accident, the crew with which Clavin was thou working brought a train of cars from the Madison yard for delivery in the East St. Louis yard, 15 cars of which train were to be delivered to the “bridge track,” and the remaining 20 in the lower yard. Clavin was on top of one of this string of 20 cars, and, when the engine first went into the lower yard, tins string was kicked or pushed down over the trestle, Clavin bringing them to a stop, and the engine then delivered (he 15 cars to the “bridge yard,” and re-1 aimed, and was reattached to the string of cars on which Clavin was working. Clavin cut off two cars, and, as the engine was pushing them forward, ran altead, to throw Them upon the Wiggins’ Ferry track. He threw the switch in question, that the cars might run in upon the Wiggins’ Perry track. To do this he was obliged to ca ieh the handhold, lift the lever, and throw it away from the rails. This lie did, sotting his foot upon it, to press it down. The two cars passed over the switch, Clavin gave the engineer the signal to stop, and immediately upon the passage of the cars threw the lever back, resetting the switch for the lead or main track, and again putting his foot upon it to bring it down into place. The next car was to be delivered to wliat is known as the “house •track.” Clavin went to where the train stood, gave the engineer a signal to go ahead, stopped in between the last two cars to pull the pin, walking with one foot over the rail between the moving cars. Tic» found the pins in the draw-liars of both cars .lammed, and was in the act of stepping out from the car to get a tool with which to knock them out, when in passing over the switch in question his foot caught in fho handhold, which rested upon the tie, and he was ¡brown to the ground in front of the truck, one car passing over his left hand, nearly severing it at the wrist, rendering amputation necessary. Clavin, while in the service of the receiver, had worked with the crews of both yards,— that is, with the crews that delivered east-bound freight to the Madison yard and west-bound freight into the East St. Louis yard. The condition of the switch was known to most of the crews, but its condition had nevei been reported. On an average of once a day, cars were delivered to the East St. Louis yard, and placed upon the various delivery tracks, passing over and using tiie switch in question. Clavin, while he was in the service Of the receiver, had been a member of the East: St. Louis crew for six whole days. He nad also worked for a considerable period with ilie night crew, doing work in both the upper and lower yards.

¶9At the conclusion of the evidence, ihe court was requested to direct a verdict for the defendant, which request was overruled, and an exception reserved. A number of instructions bearing upon the question of assumption of risk were requested by the plaintiff in error to be given in charge to the jury, which were refused, and which are not necessary to be here stated, but are considered in the opinion of the court. To the charge of the court to the jury the following errors, so far as it is deemed necessary to state them, are assigned: First. “The defendant undertook, by the law of the land, — not probably in words,— undertook to furnish to the plaintiff reasonable and safe appliances with which to carry on his work of switching.” Second. “If he [the plaintiff] did have notice that it was out of repair, or, by the exercise of reasonable diligence could have known that it was out of repair, then a higher degree of diligence was required at his hand than if he had no such notice. More care in going about a place of danger is required by the pleadings and your experience and common sense than going about a place where no danger is known or supposed to exist. As to whether he had notice, the evidence will determine, and you are the judges of that evidence.”

¶10There was a verdict for the plaintiff below, and the case is brought here for review.

¶11*552Brown & Geddes and Charles A. Schmettau (Clarence Brown, of counsel), for plaintiff in error.

¶12M. Millard (F. C. Smith, of counsel), for defendant in error.

¶13Before WOODS, JENKINS, and SHOWALTER, Circuit Judges.

¶14JENKINS, Circuit Judge,

¶15after stating the facts, delivered the opinion of the court;

¶16The objection to the statement by the court of the duty resting upon the plaintiff in error would be well taken, if the error was material. 'We have frequently held that the duty resting upon the master is not an absolute duty; that he is required to use ordinary and reasonable care to furnish appliances reasonably safe and suitable for the use of his servant, and a place reasonably safe in which he may work. Railroad Co. v. Meyers, 24 U. S. App. 295, 11 C. C. A. 439, and 63 Fed. 793; Reed v. Stockmeyer, 34 U. S. App. 727, 20 C. C. A. 381, and 74 Fed. 186; Railroad Co. v. Johnson, 81 Fed. 679. We do not think, however, that the error is material, and for this reason: The defect in the switch, assuming it to be a defect, had existed for nine months, and was an obvious defect. The evidence discloses that it was the duty of two of the servants of the receiver to make daily inspection, and to keep that part of the road and' yard in repair. They passed daily over the track. They state that they have no recollection of having observed this defective switch. There was, therefore, manifest negligence upon the part of the receiver in failure to remedy the defect, if the switch, by reason of becoming bent, was dangerous. It was an obvious defect, and had continued for so long a time that the law must imply notice to the master. It would not, therefore, have been error for the court, assuming the switch in its then condition to be dangerous, to have charged, as matter of law, that the plaintiff in error was negligent. Is the defendant in error also chargeable with notice of this obvious defect? If he is, he could not recover. The switch, if defective and dangerous, was in such condition when the defendant in error entered into the service of the receiver. He assumed, in entering upon-that service, not only such risks and perils as are incident to the performance of his duty, but the risk of such extra hazard and peril, of which he has either actual or presumed knowledge; and, where the defect is obvious, knowledge is presumed of the danger^ which it suggests, and which are apparent. Randall v. Railroad Co., 109 U. S. 479, 3 Sup. Ct. 322; Reed v. Stockmeyer, supra; Logging Co. v. Schneider, 34 U. S. App. 743, 20 C. C. A. 390, and 74 Fed. 195; Railway Co. v. Rogers, 13 U. S. App. 547, 6 C. C. A. 403, and 57 Fed. 378; Bailey, Mast. Liab. p. 80. The question should, therefore, have been submitted to the jury, whether the defendant in error knew, or ought reasonably .to have known, the danger to him from this alleged defective appliance. In the absence of any evidence on the subject, the presumption ought possibly to be applied as a matter of law; but, in view of the evidence upon the part of the defendant in error, we think it was one proper to have been submitted to the jury. Knowledge of the alleged defect is denied by him, and his service in the yard in question was mainly at night, and we think it was for the jury to *553say whether, under all of the circumstances of the case, he should have taken notice of, and be chargeable with knowledge of, the condition of the switch. It must be remembered that, when using this switch, he was engaged in the operation of switching trains, upon which his attention was centered. Could he, or did he, under such circumstances, comprehend the risk to himself from that condition of the switch? Tn this connection the remarks of Chief Justice Ryan in Dorsey v. Construction Co., 42 Wis. 583, are pertinent, and commend themselves to our judgment:

“The safety of railroad trains depends largely upon the exclusive attention of those operating them to tlie track and to the trains themselves. It is not for the interest of railroad companies or of the public, with like, if not equal, concern in the safety of trains, that persons so employed should he charged with any duty or necessity to divert their attention; and it appears to us very doubtful whether persons operating railroad trains, and passing adjacent objects in rapid motion, with their attention fixed upon their duties, ought, without- express proof of knowledge, to be charged with notice of the precise relation of such objects to the track. And, even with actual notice of the dangerous proximity of adjacent objects, it may well be doubted whether it would be reasonable to expect them, while engaged in their duties, to retain constautly in their minds an accurate profile of the route of their employment, and of collateral places and tilings, so as to be always chargeable, as well by night as by day, with notice of the precise relations of the train to adjacent objects. In the case of objects so near the track as to bo possibly dangerous, such a course might well divert tlieir attention from their duty on the train to their own safety in performing it. Notwithstanding some tilings said in some cases cited for the appellant, we should he rather inclined to think that, in the absence-of express notice of immediate danger, employés operating trains may perforin their duties under an implied warrant that they may so do without exposing themselves to extraordinary danger not necessarily incident to the course of their employment.”

¶17The court below ignored wholly the doctrine of assumption of risk, and refused the instructions requested in that behalf, erroneously supposing that absolute knowledge of the defect which existed during the entire time of his service could not, under any circumstances, amount to an assumption of risk, but merely cast upon Mm greater care in the use, or in avoiding danger from the defective appliance. This is manifest error, for which we think the judgment must be reversed. The doctrine of assumption of risk is not to be confounded with the doctrine of contributory negligence; for, where the former doctrine is applicable, the servant may exercise the greatest care, and yet he precluded from recovery for an injury in the performance of his service,, because the risk was assumed. Miner v. Railroad Co., 153 Mass. 398, 26 N. E. 994.

¶18There are other assignments of error to the charge which are not without merit, but, since there is to be a new trial, and the particular objections may be obviated upon a retrial, we refrain from comment upon them.

¶19The judgment will be reversed, and the cause remanded, with instruction to the court below to grant a new trial.

/82/f1d/550 · .json · Public domain