Cal. Educ. Code § 17250.10
Design-Build Contracts
Redline — January 1, 2011 → current.View current text →
Current — January 1, 2017
As of January 1, 2011
(a) It is the intent of the Legislature to enable school districts to utilize safe and cost-effective options for building and modernizing school facilities. The Legislature has recognized the merits of the design-build procurement process in the past by authorizing its use for projects undertaken by the University of California, specified local government projects, and state office buildings.
(b) The Legislature also finds and declares that school districts utilizing a design-build contract require a clear understanding of the roles and responsibilities of each participant in the design-build process. The benefits of a design-build contract project delivery system include an accelerated completion of the projects, cost containment, reduction of construction complexity, and reduced exposure to risk for the school district. The Legislature also finds that the cost-effective benefits to the school districts are achieved by shifting the liability and risk for cost containment and project completion to the design-build entity.
(c) It is the intent of the Legislature to provide an optional, alternative procedure for bidding and building school construction projects.
(d) In addition, it is the intent of the Legislature that the full scope of design, construction, and equipment awarded to a design-build entity shall be authorized in a single funding phase. The funding phase may be authorized concurrently with, or separately from, the phase that authorizes the creation of the performance criteria and concept drawings.
(e) It is the intent of the Legislature that design-build procurement as authorized by the act adding this chapter shall not be construed to extend, limit, or change in any manner the legal responsibility of public agencies and contractors to comply with existing laws.
(a) The Legislature finds and declares that the design-build method of project delivery, using a best value procurement methodology, has been authorized for various agencies that have reported benefits from those projects, including reduced project costs, expedited project completion, and design features that are not achievable through the traditional design-bid-build method.
(b) It is the intent of the Legislature that:
(1) This chapter provide general authorization for school districts to use the design-build method for projects.
(2) This chapter shall not be deemed to express a preference for the design-build method over other procurement methodologies.