Cal. Educ. Code § 17250.40

Design-Build Contracts

Redline — January 1, 2011 → current.View current text →
Current — January 1, 2017
As of January 1, 2011
The Superintendent, in consultation with the Department of General Services, the State Energy Resources Conservation and Development Commission, Seismic Safety Commission, school district representatives, and industry representatives, shall develop guidelines for design-build projects. The guidelines shall be developed within six months of the operative date of this chapter.
(a) If the school district elects to award a project pursuant to this chapter, retention proceeds withheld by the school district from the design-build entity shall not exceed 5 percent.
(b) In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld may not exceed the percentage specified in the contract between the school district agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the design-build entity, prior to or at the time the bid is requested, that a bond may be required and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the school district and the design-build entity from any payment made by the design-build entity to the subcontractor.

Official source: California Legislative Information. Reproduced from public-domain California statutes; confirm against the official source for the current text. Not legal advice.