Cal. Pub. Res. Code § 8815.2
California Coordinate System
Redline — January 1, 2011 → current.View current text →
Current — January 1, 2023
As of January 1, 2011
The epoch for a survey using CCS83 coordinate shall be the published NGS or CSRC epoch of a published coordinate for a controlling station used for that survey. Such surveys performed after December 31, 1999, shall be based on the “1991.35” epoch or a subsequent published NGS or CSRC epoch.
The epoch for a survey using CCS83 coordinates shall be the published NGS or CSRC datum realization and epoch date of a published coordinate for a controlling station used for that survey. These surveys performed after December 31, 1999, shall be based on the “NAD83 (1992) epoch 1991.35” datum realization and epoch or a subsequent published NGS or CSRC datum realization and epoch.
Official source: California Legislative Information. Reproduced from public-domain California statutes; confirm against the official source for the current text. Not legal advice.