O.C.G.A. § 25-2-4.1

Permit, license, and inspection fees and charges

1992, a hyphen was inserted between Code 1981, § 25-2-4.1, enacted by Ga

(a) The Commissioner is authorized to assess and collect, and persons so assessed shall pay in advance to the Commissioner, fees and charges under this chapter as follows:

(1) New anhydrous ammonia permit for storage in bulk (more than 2,000 gallons aggregate capacity) for

sale or distribution one-time fee .................c cece eens $ 150.00 (2) Annual license for manufacture of explosives other

than-fireworks sareren iE E E ET TE eea 150.00 (3) Annual license for manufacture, storage, or trans-

port of fireworks ........... iet eE a AE Ea 1,500.00 (4) -Carnival icense irren rda E EE a 150.00 (5) Certificate of occupancy ........... ccc cece eee eeee cece tees eeeeeees 100.00 (6) Construction plan review: ...........cccce ee eeeeeeeeeeeeeeeeeees 150.00

(A) Bulk storage construction .................0ceeeeeee eee ees 150.00

(B) Building construction, 10,000 square feet or less ... 150.00 (C) Building construction, more than 10,000 square

feet i ever isea e ea a a ti a ey .015

per square foot

(D) Other construction ...........sssseesssoesssersseerrsseeees 150.00

(7) Fire sprinkler contractor certificate of competency ....... 150.00 (8) Liquefied petroleum gas storage license:

(A) 2,000 gallons or less ...........ccccc cece cece eeeeeeeeeeeees 150.00

(B) More than 2,000 gallons .................cccceeeeee eens 600.00

(9) Building construction inspection: (A) 80 percent completion, 100 percent completion,

annual, and first follow-up ................cccceeeeee eee e ees none (B) Second follow-up ...............cccc cece cece ee eeeeeeeeeeeees 150.00 (C) Third and each subsequent follow-up ................. 220.00

(10) Purchase, storage, sale, transport, or use of explosives other than fireworks:

(A) 500 pounds or less +s: 2svgisirouinaeccel nu veewedawioresadas 75.00

(B) More than 500 pounds .................ccc cece eee e eee e ees 150.00 (11) New self-service gasoline station permit one-time

TOE E suena dleve acs ainda wuhs oAceeaiane 150.00 (12) New permit to dispense compressed natural gas

(CNG) for vehicular fuel one-time fee .................0..0 00 150.00

(b) The licenses and permits for which fees or charges are required pursuant to this Code section shall not be transferable. A new license or permit and fee are required upon change of ownership.