O.C.G.A. § 32-2-79
Reporting on congestion mitigation; letting of projects
Redline — December 1, 2018 → current.View current text →
Current — August 17, 2021
As of December 1, 2018
At a minimum, the staff of the department shall jointly identify and report to the board by July 31 of each odd-numbered year those potential undertakings best suited for delivery under the procedures of Code Section 32-2-80 and that are expected to provide the greatest public benefit through enhanced public safety, enhanced mobility of goods, congestion mitigation, enhanced trade and economic development, improved air quality or land use, or reduction of public expenditures due to improved transportation efficiency or infrastructure preservation as aligned with the state-wide strategic transportation plan as defined in Code Section 32-2-41.1.
(2) Any project identified pursuant to subsection (a) of this Code section that will not be initiated within two years of the reporting date or that does not have specific available and complete funding may be let and constructed utilizing the procedures of this Code section and Code Section 32-2-80. All personnel of the department shall cooperate in all respects in the letting, construction, maintenance, and operation of such projects, including without limitation providing such access and control of portions of the state highway system as may be requested or required from time to time for such purposes.
(3) Projects wholly or partly in a metropolitan planning area shall be included in a fiscally constrained transportation improvement program.
Current official text: Official Code of Georgia Annotated (LexisNexis). Digitized from the Internet Archive scan of the OCGA. Reproduced from public-domain Georgia statutes; confirm against the official source for the current text. Not legal advice.