Public-domain · open source
OpenJurist

Iowa Code § 309.81

Record of plans

Redline — January 1, 2023 → current.View current text →
Current — January 1, 2024
As of January 1, 2023
Before beginning the construction of a permanent bridge or culvert by day labor or by contract, the county engineer shall file the plans, specifications, estimate of drainage area, estimates of costs, and specific designation of the location of the bridge or culvert in the county engineer’s office.
Before beginning the construction of a permanent bridge or culvert by day labor or by contract, the county engineer shall file the plans, specifications, estimate of drainage area, estimates of costs, and specific designation of the location of the bridge or culvert in the county engineer’s office.
Section amended

Official source: Iowa Legislature. Reproduced from public-domain Iowa statutes; confirm against the official source for the current text. Not legal advice.