N.C. Gen. Stat. § 130A-339
Limitation on electrical service
Redline — June 1, 2021 → current.View current text →
Current — April 1, 2022
As of June 1, 2021
No person shall allow permanent electrical service to a residence, place of business or place of public assembly upon construction, location or relocation until the official electrical inspector with jurisdiction as provided in G.S. 143-143.2 certifies to the electrical supplier that the required improvement permit authorization for wastewater system construction and an operation permit or authorization under G.S. 130A-337(c) or the letter of confirmation authorizing wastewater system operation under G.S. 130A-336.1(m) has been obtained. Temporary electrical service necessary for constructing a residence, place of business or place of public assembly can be provided upon compliance with G.S. 130A-338.
No person shall allow permanent electrical service to a residence, place of business or place of public assembly upon construction, location or relocation until the official electrical inspector with jurisdiction as provided in G.S. 143-143.2 certifies to the electrical supplier that the required improvement permit authorization for wastewater system construction and an operation permit or authorization under G.S. 130A-337(c) or the letter of confirmation authorizing wastewater system operation under G.S. 130A-336.1(m) has been obtained. Temporary electrical service necessary for constructing a residence, place of business or place of public assembly can be provided upon compliance with G.S. 130A-338.
History
Official source: North Carolina General Assembly. Reproduced from public-domain North Carolina statutes; confirm against the official source for the current text. Not legal advice.